Tuesday, May 31, 2011

Quilt Room Challenge - Month 1



I have a couple of projects in the works that you'll have to wait and
see next month. Here is what I was able to make and
 "clean" out of the sewing room this month.



I made three Little Twister table toppers, the darling
 alphabet sampler and one Jo Morton Quilt.


I quilted three charity quilts for Project Linus.


And I put away a new pair of shoes (very cute aren't they) and a box of Barbie Doll things that for some unknown reason got pulled out from under the bed.

Tuesday, May 3, 2011

Sewing Room Challenge or No This is not a New Episode of Hoarders

I really am not hoarding anything; I just have a lot of great projects in the works. Here is the challenge: no projects in this room can be packed away or moved to another storage spot (of which there are several). All of these projects need to be completed in order to be moved. This room has to get cleaned up so the sewing machine has to heat up. Check back on the first of each month over the summer to see the progress I'm making.




Graduation Beer

The boys from 128 Kedzie get their own beer!


Ali's Quilt


Ali's graduation quilt is all done. The picture isn't too different from the first one I posted, but I took a close up of the center medallion so that you can see the quilting on it. I'm very happy with the flower motif as it matches with the white on white fabric in the center.